Achievements during the week
The emergency exit staircase from the first floor at the rear of the building has been installed
Previous loft access hatch and ladder in the entrance hall removed
Ceiling of the toilets, kitchen and entrance hall removed
Drop the loft floor beams by approx 50mm cutting away brick work as necessary
Reinstate and re-fix beams over kitchen, toilets and entrance hall
Install level flooring over the entire loft area
Some of the loft contents loaded to skip for removal